[1]
Andry Rusdiyanto 2021. ANALISIS FAKTOR-FAKTOR YANG BERPENGARUH TERHADAP TIDAK TERCAPAINYA WAKTU PELAKSANAAN PEKERJAAN PROYEK PEMBANGUNAN JALUR GANDA KERETA API LINTAS SELATAN JAWA KM.64+200 S.D KM. 67+000 ANTARA MOJOKERTO-JOMBANG. JURNAL DAKTILITAS. 1, 2 (Dec. 2021), 15-22. DOI:https://doi.org/10.36563/daktilitas.v1i2.444.