PENGENDALIAN WAKTU DAN BIAYA MENGGUNAKAN METODE EARNED VALUE ANALYSIS PADA PROYEK KONSTRUKSI. (2026). JURNAL DAKTILITAS, 6(1), 1-12. https://doi.org/10.36563/8xp98v57