Lutfan Anas Zahir. (2021). STRATEGI OPTIMASI WAKTU DAN BIAYA MENGGUNAKAN TIME COST TRADE OFF (TCTO) PADA PEMBANGUNAN GEDUNG RUANG KELAS SMPN 1 BESUKI . JURNAL DAKTILITAS, 1(2), 36-51. https://doi.org/10.36563/daktilitas.v1i2.442