Andry Rusdiyanto. (2021). ANALISIS FAKTOR-FAKTOR YANG BERPENGARUH TERHADAP TIDAK TERCAPAINYA WAKTU PELAKSANAAN PEKERJAAN PROYEK PEMBANGUNAN JALUR GANDA KERETA API LINTAS SELATAN JAWA KM.64+200 S.D KM. 67+000 ANTARA MOJOKERTO-JOMBANG. JURNAL DAKTILITAS, 1(2), 15-22. https://doi.org/10.36563/daktilitas.v1i2.444