“PENGENDALIAN WAKTU DAN BIAYA MENGGUNAKAN METODE EARNED VALUE ANALYSIS PADA PROYEK KONSTRUKSI”. 2026. JURNAL DAKTILITAS 6 (1): 1-12. https://doi.org/10.36563/8xp98v57.