[1]
Lutfan Anas Zahir, “STRATEGI OPTIMASI WAKTU DAN BIAYA MENGGUNAKAN TIME COST TRADE OFF (TCTO) PADA PEMBANGUNAN GEDUNG RUANG KELAS SMPN 1 BESUKI ”, daktilitas, vol. 1, no. 2, pp. 36-51, Dec. 2021.