[1]
“IMPROVING THE ACCURACY OF COFFEE BEVERAGE PRODUCTION COSTS USING THE FULL COSTING METHOD”, jat, vol. 5, no. 2, pp. 1172–1191, Oct. 2026, doi: 10.36563/ng3p2125.