(1)
ANALISIS PERHITUNGAN HARGA POKOK PRODUKSI TEMPE DENGAN MENGGUNAKAN METODE FULL COSTING. JB 2023, 2 (1), 37-50. https://doi.org/10.36563/jimbien.v2i1.1100.