Pengembangan Kerangka Double Closed-Loop BIM-AR untuk Inspeksi Operasional Sistem Plumbing

Authors

  • Dica rosmyanto Politeknik Astra
  • Tri Joko Wahyu Adi, Ph.D Institut Teknologi Sepuluh Nopember
  • Aryma Yudi PT. Hidronav Tehnikatama

DOI:

https://doi.org/10.36563/5x1gb668

Keywords:

BIM-AR, Double Closed-Loop, Inspeksi Operasional, Sistem Plumbing, Asset Information Model

Abstract

Inspeksi pemeliharaan bangunan masih menghadapi kendala ketika jalur plumbing berada pada area tersembunyi, seperti plafon, shaft, dinding, atau ruang servis. Penelitian ini mengembangkan kerangka double closed-loop BIM-AR untuk inspeksi operasional sistem plumbing air bersih dan air kotor pada Gedung C Politeknik Astra. Metode penelitian menggunakan pendekatan kuantitatif eksperimental dengan membandingkan inspeksi visual eksisting dan inspeksi berbantuan BIM-AR pada objek yang sama. Data diperoleh melalui observasi lapangan, wawancara petugas inspeksi, dan time-motion study, kemudian dianalisis menggunakan statistik deskriptif dan uji paired sample t-test. Kerangka yang dikembangkan terdiri dari operational loop dan managerial loop yang saling terhubung melalui umpan balik. Hasil penelitian menunjukkan bahwa BIM-AR menurunkan total waktu inspeksi dari 225 menit menjadi 95 menit atau sebesar 57,78%. Rata-rata akurasi identifikasi meningkat dari 54,75% menjadi 100,00%, sedangkan biaya operasional inspeksi menurun dari Rp140.625 menjadi Rp59.375. Hasil uji statistik menunjukkan perbedaan signifikan pada waktu, akurasi, dan biaya operasional dengan p-value kurang dari 0,05. Meskipun membutuhkan investasi awal sebesar Rp59.300.000, BIM-AR memiliki manfaat strategis untuk penerapan berulang dan lebih luas melalui pembaruan AIM, prioritas pemeliharaan, rekomendasi perbaikan, dan pengambilan keputusan berbasis data.

Downloads

Download data is not yet available.

References

Argyris, C. (1977). Double loop learning in organizations. Harvard Business Review, 55(5), 115-125.

Alavi, H. et al. (2021). BIM-based augmented reality inspection of facility management. Universitat Politecnica de Catalunya.

Besiktepe, D., Ozbek, M.E. and Atadero, R.A. (2021). Condition assessment framework for facility management based on fuzzy sets theory.

Diao, P. and Shih, N. (2019). BIM-Based AR Maintenance System (BARMS) as an intelligent instruction platform for complex plumbing facilities. Applied Sciences.

Ikuabe, M., Awuzie, B.O. and Ogungbe, M. (2025). Towards a computerised maintenance management system for healthcare facilities in South. https://doi.org/10.31705/WCS.2025.103.

Kementerian Pekerjaan Umum. (2024). SOP Implementasi Building Information Modeling (BIM). Available at: https://bim.pu.go.id/publication.

Khan, S., Panuwatwanich, K. and Usanavasin, S. (2024). Integrating building information modeling with augmented reality: application and empirical assessment in building facility management. Engineering, Construction and Architectural Management, 31(7), pp. 2809-2828. https://doi.org/10.1108/ECAM-12-2021-1146.

Moghaddam, S. (2026). An integrated BIM-based augmented reality framework for improving facility maintenance management workflow. Engineering, Construction and Architectural Management, 33(3), pp. 2007-2047. https://doi.org/10.1108/ECAM-12-2024-1671.

Park, J. et al. (2022). Inspection data exchange and visualization for building maintenance using AR-enabled BIM. ISARC, pp. 483-490.

PerMen PU. (2008). Peraturan Menteri Pekerjaan Umum No. 24/PRT/M/2008 tentang Pedoman Pemeliharaan dan Perawatan Bangunan Gedung.

Rohman, A., Rinaldi, A. and Hidayat, F. (2022). Pembuatan augmented reality berbasis titik untuk mendukung Building Information Modelling (BIM). Jurnal Inovasi Konstruksi, 1(1), pp. 19-24. https://doi.org/10.56911/jik.v1i1.13.

Soetjipto, J.W., Zarkasi, I.K. and Trisiana, A. (2023). Model of building maintenance planning using the Building Information Modeling (BIM). Jurnal Permukiman, 18(1), pp. 1-15. https://doi.org/10.31815/jp.2023.18.1-15.

Wastunimpuna, B.Y.A. and Purwanto, L.M.F. (2021). Augmented Reality dalam Proses Desain Arsitek Masa Depan. JoDA Journal of Digital Architecture, 1(1), p. 19. https://doi.org/10.24167/joda.v1i1.3494.

Downloads

Published

2026-06-30

Issue

Section

Articles

Deprecated: json_decode(): Passing null to parameter #1 ($json) of type string is deprecated in /var/www/html/plugins/generic/citations/CitationsPlugin.php on line 68

How to Cite

Pengembangan Kerangka Double Closed-Loop BIM-AR untuk Inspeksi Operasional Sistem Plumbing. (2026). JURNAL DAKTILITAS, 6(1), 82-88. https://doi.org/10.36563/5x1gb668